Group factory lots for the right handover
We match retail cartons to the receiver’s labels before loading. Separately record any crated or palletised pieces so that their size and handling can be checked against the Romanian truck booking.
We ship factory orders from China to Romanian businesses and receiving warehouses. The available services include air with UPS, sea freight for individual cartons and truck delivery for larger pieces.
Get a freight quoteThe ocean freight schedules and the UPS air services measure different stages of the trip to Romania. We check any onward journey against the receiver’s full address. Check delivery coverage.
We match retail cartons to the receiver’s labels before loading. Separately record any crated or palletised pieces so that their size and handling can be checked against the Romanian truck booking.
For an inland route through the Constanța area, we check where the container or pallets will be released. Give us the Bucharest-area warehouse address, unloading instructions and hours when booking the onward truck.
Send the complete receiving address and tell us how the site accepts freight. These are the local details we check before arranging the final delivery.
Compare the cargo and handover for each service below. The rate tables give the published freight bands. We quote other movements using the actual route, cargo and delivery address.
Scroll each table sideways to compare services.
| Service | Typical cargo | Transit time or handover | Billing basis |
|---|---|---|---|
| International express courier to Romania | Urgent spare parts, a sample assembly or a small order that an identified Romanian consignee can receive. | We confirm the estimated arrival for the actual pickup date and postcode. | Each quote uses the packed weight and measurements, selected service and exact destination. |
| Ocean freight with parcel delivery | General stock in cartons | 40–45 days from sailing to carrier pickup. Allow additional time for final delivery. | For each carton we compare gross kg with length × width × height in cm ÷ 6,000, then apply a 12 kg minimum per carton. |
| Ocean freight with truck delivery | Bulky or palletised orders | 40–45 days from sailing to pickup, followed by the local truck appointment. | The oversized freight table quotes per kilogram at 70, 100, 200, 300, 500, 1,000 and 2,000 kg. |
| Air freight with UPS delivery | General or approved battery-equipped goods | General cargo: 8–10 working days on standard air or 4–6 on priority. Approved installed batteries: 10–13 or 5–7 working days. | Zone 4 has breaks at 21, 45, 100, 500 and 1,000 kg. |
| Full containers via Constanța and inland Romania | A full factory lot or several suppliers whose stock must arrive in one sealed load. | We provide the booked arrival estimate, the inland connection and the receiving slot as separate milestones. | Request the container rate, local terminal charges, inland move and empty return. |
| Conventional air cargo to Bucharest | Production parts, machinery components and larger samples that need to remain together on a pallet. | We quote the airline cutoff and arrival separately from the time for cargo recovery and the warehouse appointment. | The quotation states the airline’s chargeable weight, handling at origin and arrival and the cost of any delivery. |
| Movement | Reference timing | What happens next |
|---|---|---|
| Standard ocean + parcel | 40–45 days from sailing to carrier pickup | Local carrier scans and delivers the cartons. |
| Ocean + truck | 40–45 days from sailing to pickup | Receiving slot and access confirmed with the warehouse. |
| Air + UPS, general cargo | Standard 8–10 or priority 4–6 working days | Time window and final UPS delivery date confirmed by booking. |
| Air + UPS, installed batteries | Standard 10–13 or priority 5–7 working days | Subject to product acceptance and the booked flight. |
| Shipment or event | Applicable condition | Who handles it |
|---|---|---|
| Truck to a receiving warehouse | The schedule lists distinct postcode blocks, including 01–08, 10–14 and 20–24. Prefixes such as 09 or 15 need an individual check. | We verify the full postcode with the haulier before confirming the delivery price. |
| A further tax billed on an ocean parcel | The parcel terms pass on an additional import tax at the actual amount if one is charged. | We confirm the duty scope and contact for any later charge in the booking. |
| Air parcel selected for a second clearance | The Romanian recipient must submit the additional declaration and pay any tax due. | We confirm the recipient’s contact details before dispatch so they can respond to customs. |
Freight rates can change at any time. We update these tables periodically. These figures come from a rate sheet recorded on . Your written quote confirms the current price, billing currency, duties, taxes and delivery charges.
Base freight rates are in Chinese yuan (CNY) per chargeable kg. Other displayed currencies are indicative conversions. Select CNY to view the base amounts. Conversion uses 1 EUR = 5.3442 RON, 7.4801 CNY, 1.1214 USD. European Central Bank reference rates for November 10, 2026. Your written quote confirms the amount and currency payable.
| Service and delivery area | Rate by weight band |
|---|---|
| Ocean freight + parcel delivery | |
| Ocean parcel to RomaniaDaily loading and two sailings a week were listed. The 40–45 day estimate ran from sailing to carrier pickup. Final delivery followed. |
|
| Ocean freight + truck delivery | |
| Listed postcode areas01–08 / 10–14 / 20–24 / 30–33 / 40–45 / 50–55 / 60–62 / 70–73 / 80–82 / 90–92. We check the full postcode and receiving address before quoting. Based on loading at Qingxi. Nancheng or Bantian added RON 0.07/kg, Guangzhou or Fuyong RON 0.14/kg and Yiwu RON 0.36/kg. Allow 40–45 days from sailing to cargo pickup, plus time for trucking and the delivery appointment. |
|
| Air freight + UPS parcel delivery | |
| General cargo, standard (A0) · Zone 48–10 business days, allocated space from mainland China. UPS delivery. The listed non-FBA surcharge was RON 71.45 per shipment, subject to the exemptions below. |
|
| General cargo, expedited (CK0) · Zone 44–6 business days, direct flight from mainland China. UPS delivery. The listed non-FBA surcharge was RON 71.45 per shipment, subject to the exemptions below. |
|
| Installed batteries, standard (A1) · Zone 410–13 business days, routing via Central Asia. UPS delivery. The listed non-FBA surcharge was RON 71.45 per shipment, subject to the exemptions below. |
|
| Installed batteries, expedited (CK1) · Zone 45–7 business days, direct flight from Hong Kong or South Korea. UPS delivery. The listed non-FBA surcharge was RON 71.45 per shipment, subject to the exemptions below. |
|
Give us the Romanian postcode, consignee and customs contact, the factory address and packed measurements. For a truck delivery include warehouse hours and any special handling.