Factory pickups with separate lot references
We mark each supplier’s lots with the warehouse or purchase-order reference. During consolidation we check piece counts, dimensions and whether pallets may be stacked.
We arrange air parcels, ocean cartons and pallet delivery from China to Poland. For warehouse freight we confirm the complete Polish postcode and last truck leg before the supplier releases the load.
Get a freight quoteThe ocean freight schedules and the UPS air services measure different stages of the trip to Poland. We check any onward journey against the receiver’s full address. Check delivery coverage.
We mark each supplier’s lots with the warehouse or purchase-order reference. During consolidation we check piece counts, dimensions and whether pallets may be stacked.
For delivery through an inland terminal such as Kutno or Łódź, give us the dock contact and working hours. We arrange the road leg after release and confirm whether the receiver provides a forklift.
Send the complete receiving address and tell us how the site accepts freight. These are the local details we check before arranging the final delivery.
Compare the cargo and handover for each service below. The rate tables give the published freight bands. We quote other movements using the actual route, cargo and delivery address.
Scroll each table sideways to compare services.
| Service | Typical cargo | Transit time or handover | Billing basis |
|---|---|---|---|
| International express courier for Polish deliveries | Small engineering samples, urgent replacement components or business documents for a Polish buyer. | We use the factory location, ready date and complete Polish postcode to request a delivery estimate. | The quote reflects actual or dimensional weight, the service and any applicable area or handling charges. |
| Ocean freight with parcel delivery | Cartons for stock replenishment | 40–45 days from sailing to carrier pickup. Allow additional time for final delivery. | For each carton we compare gross kg with length × width × height in cm ÷ 6,000, then apply a 12 kg minimum per carton. |
| Ocean freight with truck delivery | Pallets under a warehouse order | 40–45 days from sailing to pickup, followed by the local truck appointment. | The oversized freight table quotes per kilogram at 70, 100, 200, 300, 500, 1,000 and 2,000 kg. |
| Air freight with UPS delivery | Time-sensitive cartons | General cargo: 8–10 working days on standard air or 4–6 on priority. Approved installed batteries: 10–13 or 5–7 working days. | Zone 2 has breaks at 21, 45, 100, 500 and 1,000 kg. |
| Full-container shipping through Poland’s Baltic ports | Larger production runs and stock orders that the consignee wants kept together from loading to delivery. | We quote the sailing and any feeder leg to Poland, then a separate delivery window after equipment release and dock confirmation. | The price covers the specified container type and named port. |
| Air freight for pallets and crates to Poland | Production spares, boxed equipment and urgent replenishment that needs an intact pallet rather than individually routed parcels. | We confirm the origin hand-in deadline, flight arrival and anticipated recovery time. | We quote the applicable air weight, origin pickup, destination cargo-terminal charges and delivery vehicle. |
| Movement | Reference timing | What happens next |
|---|---|---|
| Standard ocean + parcel | 40–45 days from sailing to carrier pickup | Local carrier scans and delivers the cartons. |
| Ocean + truck | 40–45 days from sailing to pickup | Receiving slot and access confirmed with the warehouse. |
| Air + UPS, general cargo | Standard 8–10 or priority 4–6 working days | Time window and final UPS delivery date confirmed by booking. |
| Air + UPS, installed batteries | Standard 10–13 or priority 5–7 working days | Subject to product acceptance and the booked flight. |
| Shipment | Which rate applies | What we check |
|---|---|---|
| Separate cartons by ocean parcel | Poland has a national weight-band schedule for parcel delivery. | We check each carton’s billed weight and any address-specific charge. |
| Pallet by ocean and truck | Truck delivery uses postcode prefixes 00–78 and 80–99. | We match the complete postcode, including a leading zero, to the receiving warehouse. |
| Pallet to a postcode starting with 79 | Prefix 79 is absent from the truck table. The national parcel rate does not price this pallet booking. | We request an individual truck price using the full address, pallet size and weight. |
Freight rates can change at any time. We update these tables periodically. These figures come from a rate sheet recorded on . Your written quote confirms the current price, billing currency, duties, taxes and delivery charges.
Base freight rates are in Chinese yuan (CNY) per chargeable kg. Other displayed currencies are indicative conversions. Select CNY to view the base amounts. Conversion uses 1 EUR = 4.387 PLN, 7.4801 CNY, 1.1214 USD. European Central Bank reference rates for November 10, 2026. Your written quote confirms the amount and currency payable.
| Service and delivery area | Rate by weight band |
|---|---|
| Ocean freight + parcel delivery | |
| Ocean parcel to PolandCountry-level rate. Individual postcodes were not priced. Daily loading and two sailings a week were listed. The 40–45 day estimate ran from sailing to carrier pickup. Final delivery followed. |
|
| Ocean freight + truck delivery | |
| Listed postcode areas00–78 / 80–99. Based on loading at Qingxi. Nancheng or Bantian added PLN 0.06/kg, Guangzhou or Fuyong PLN 0.12/kg and Yiwu PLN 0.29/kg. Allow 40–45 days from sailing to cargo pickup, plus time for trucking and the delivery appointment. |
|
| Air freight + UPS parcel delivery | |
| General cargo, standard (A0) · Zone 28–10 business days, allocated space from mainland China. UPS delivery. The listed non-FBA surcharge was PLN 58.65 per shipment, subject to the exemptions below. |
|
| General cargo, expedited (CK0) · Zone 24–6 business days, direct flight from mainland China. UPS delivery. The listed non-FBA surcharge was PLN 58.65 per shipment, subject to the exemptions below. |
|
| Installed batteries, standard (A1) · Zone 210–13 business days, routing via Central Asia. UPS delivery. The listed non-FBA surcharge was PLN 58.65 per shipment, subject to the exemptions below. |
|
| Installed batteries, expedited (CK1) · Zone 25–7 business days, direct flight from Hong Kong or South Korea. UPS delivery. The listed non-FBA surcharge was PLN 58.65 per shipment, subject to the exemptions below. |
|
Send the Polish postcode, warehouse order reference and preferred receiving date. Include each supplier’s ready date and the measurements of finished cartons or pallets.