FAS and FOB require a precise port handover and a workable loading plan. VelFreight reviews the China-origin freight task with the cargo measurements, handling requirements and agreed sale term before coordinating a suitable transport arrangement.
Price the work between alongside and on board
Tell us the named loading port, cargo dimensions, gross weight and agreed alongside or on-board handover. We review the handling and transport scope with the relevant operators so the quotation identifies which work is included and which approvals are still needed.
Compare your options ↓Choose the option that fits
Start with where the seller actually delivers
FAS means Free Alongside Ship; FOB means Free on Board. Both are sea or inland-waterway rules. Their normal delivery points differ: FAS places the goods alongside the nominated vessel at the origin port, while FOB places them on board. The seller handles export formalities under both; the buyer arranges the main carriage. Confirm the precise port handover before allocating handling and loading costs.
These are useful distinctions when the cargo and port operation permit a direct alongside or on-board handover. A conventional container delivery may occur at a terminal well before either event, so review the appropriate carrier-handover arrangement instead. Do not select a rule solely because a supplier has used the abbreviation on previous invoices.
Describe each unit before asking for a lift price
The following original example concerns four fictional machine-base skids. It is a planning exercise, not evidence that VelFreight or a specific port accepts this cargo. A competent handling provider must assess the actual centre of gravity, lifting points, equipment, access and securing requirements before any lift is arranged.
| Cargo field | Teaching input | Required confirmation |
|---|---|---|
| Units | 4 skids, S01–S04 | Exact identity and condition at handover |
| Outside size each | 400 × 120 × 150 cm | Include supports and protrusions |
| Gross weight each | 2,500 kg | Use a reliable measured weight |
| Total gross weight | 4 × 2,500 = 10,000 kg | Does not establish a crane selection |
| Volume | 4 × 4.00 × 1.20 × 1.50 = 28.80 m³ | Cargo dimensions remain needed for stowage |
| Lifting and stacking | Engineered arrangement required; no stacking assumed | Obtain approved lifting points and restraint plan |
For a real quotation, attach drawings and photographs of the finished shipping unit. Distinguish a marked lifting point from a feature that merely looks convenient to use. The port team needs the pickup and landing positions as well as the weight. A quoted hourly rate is not confirmation that the proposed crane can safely perform the movement.
Compare the same shipment through the same destination scope
Every USD figure below is invented to explain cost allocation. Assume the goods base value is USD 40,000, the agreed operation is feasible and both alternatives use the same vessel movement. Duties, taxes, cargo insurance, inspections, storage and exceptional work are excluded. These totals are not live quotes or final landed costs.
| Cost line | FAS example | FOB example |
|---|---|---|
| Goods plus seller’s priced origin road, export and alongside work | 41,300 | 41,300 |
| Loading package in seller’s price | Not included | 450 |
| Illustrative supplier sale price | 41,300 | 41,750 |
| Buyer’s separately arranged loading package | 450 | Included above |
| Main ocean carriage | 2,800 | 2,800 |
| Destination handling and road connection | 900 | 900 |
| Import clearance service, excluding taxes | 150 | 150 |
| Destination unloading | 320 | 320 |
| Comparable listed total | 45,920 | 45,920 |
The origin work embedded in USD 41,300 is assumed to be USD 900 road transport + USD 150 export-service coordination + USD 250 port access and alongside handling, on top of the USD 40,000 goods value. The FAS comparison is 41,300 + 450 + 2,800 + 900 + 150 + 320 = USD 45,920. The FOB comparison reaches the same total because the assumed USD 450 loading work is already in the supplier price.
In a real contract the loading package may be arranged differently or included in another service line. Ask which operation each amount buys and whether it is already covered by the freight contract. Commercial margins can also differ. The table demonstrates a method for comparing scope; it does not require FAS and FOB prices to have equal totals.
Check minimum time and overtime on the loading quotation
The teaching USD 450 loading package can be reconstructed from an assumed three-hour minimum at USD 120 per hour plus USD 90 for a separately specified rigging service. These numbers are invented and do not describe a port tariff. Actual equipment selection and work scope must precede the price calculation.
| Scenario | Calculation / USD | Difference from base |
|---|---|---|
| Completed within the assumed three-hour minimum | 3 × 120 + 90 = 450 | Base |
| Operation uses 4.5 hours, billed by actual half-hour in this example | 4.5 × 120 + 90 = 630 | 180 more |
| Operation uses 5 hours | 5 × 120 + 90 = 690 | 240 more |
Ask how the clock begins and ends, whether there is a minimum call-out, how partial hours are rounded and whether standby is a separate charge. If the crane arrives before access is available, an apparently short lift may create a longer bill. Record the cause and approving contact for extra time. Who bears an exception depends on the agreement and circumstances; do not allocate it mechanically from the word loading.
Keep an event record for the handover and lift
| Event | Evidence to retain | Why it matters |
|---|---|---|
| Port arrival | Skid IDs, vehicle receipt, condition photos and time | Identifies arrival without assuming delivery is complete |
| Alongside position confirmed | Location, nominated vessel, count, condition and receipt | Evidence relevant to the agreed FAS handover |
| Lift and landing on board | Accepted lift record and on-board confirmation | Evidence relevant to the agreed FOB handover |
| Loading exception | Damage, time, responsible contacts and immediate action | Preserves facts without prematurely deciding liability |
| Vessel or berth change | Revised nomination and accepted operating plan | Shows why the original plan or quote changed |
In a normal sequence, goods might arrive at a port yard at 08:00, reach the agreed alongside position at 13:00 and be loaded on board at 17:00. Those are three different events. These times are invented. If an incident occurs at 15:00, the investigation needs its precise location and the handover records, not merely the truck’s 08:00 arrival stamp.
The example assumes proper nomination, notices and identified goods. Vessel delay, failure to provide instructions or other non-performance can affect risk and extra-cost allocation under the complete rules and contract. Escalate those facts to the commercial parties rather than treating the simplified timeline as a ruling on a dispute.
Resolve the vessel, berth and receiving conditions together
Before dispatch, obtain the nominated vessel, agreed loading window, receiving location and contact responsible for changes. Confirm whether the supplier or buyer books the equipment and whether the operator accepts the lifting method. If the intended berth changes, recheck the road approach, ground conditions and position of the cargo relative to the equipment.
At destination, identify how the receiver will collect and unload the four skids. An economical origin arrangement does not remove the need for suitable receiving equipment. Keep destination work in the total comparison, even though it occurs after the origin sales delivery. This makes the financial plan useful for the order rather than only for the port invoice.
Use the agreed named origin port and the Incoterms 2020 edition in the contract, with enough operational detail to identify the actual handover. Confirm payment and ownership terms separately. A rule selection should be reflected in the instructions sent to the supplier, forwarder, port operator and buyer’s receiving team.
Questions buyers often ask about FAS and FOB
Is FAS the same as delivered to a port warehouse? No. Establish the alongside-ship delivery required by the agreed arrangement. A warehouse or terminal receipt may record an earlier event.
Does FOB include the international freight? The buyer arranges the main carriage under the standard allocation. Any additional seller service must be clearly agreed and priced.
Does a lighter load automatically cost less to lift? The quote also depends on equipment, reach, access, work time and the actual operation. Give the handling provider the complete cargo and site information rather than estimating from total tonnes alone.
Continue planning with VelFreight: Incoterms 2020 Explained: All 11 Shipping Terms, Costs and Risk →
Example costs and timelines are for planning. Send us your cargo, route and delivery needs for a shipment-specific quote and acceptance review.