FAS and FOB require a precise port handover and a workable loading plan. VelFreight reviews the China-origin freight task with the cargo measurements, handling requirements and agreed sale term before coordinating a suitable transport arrangement.

Ask VelFreight about this shipment ↗
OUR RECOMMENDATION

Price the work between alongside and on board

Tell us the named loading port, cargo dimensions, gross weight and agreed alongside or on-board handover. We review the handling and transport scope with the relevant operators so the quotation identifies which work is included and which approvals are still needed.

Compare your options ↓

Choose the option that fits

  1. The buyer controls vessel nomination and ship loading

    Assess FAS only where an alongside-ship handover is actually workable for the cargo and terminal.

    Before choosing: A yard receipt is not automatically evidence that the goods have been placed alongside the nominated vessel.

  2. The seller agrees to deliver the goods on board

    Assess FOB with the loading operation, its acceptance and the buyer’s vessel instructions confirmed.

    Before choosing: The seller needs an executable loading arrangement, not only a truck booking to the port.

  3. The goods will enter a container terminal before vessel loading

    Review FCA at the carrier handover point before using FAS or FOB for the transaction.

    Before choosing: A container gate-in, alongside delivery and on-board loading are different events.

Start with where the seller actually delivers

FAS means Free Alongside Ship; FOB means Free on Board. Both are sea or inland-waterway rules. Their normal delivery points differ: FAS places the goods alongside the nominated vessel at the origin port, while FOB places them on board. The seller handles export formalities under both; the buyer arranges the main carriage. Confirm the precise port handover before allocating handling and loading costs.

These are useful distinctions when the cargo and port operation permit a direct alongside or on-board handover. A conventional container delivery may occur at a terminal well before either event, so review the appropriate carrier-handover arrangement instead. Do not select a rule solely because a supplier has used the abbreviation on previous invoices.

Describe each unit before asking for a lift price

The following original example concerns four fictional machine-base skids. It is a planning exercise, not evidence that VelFreight or a specific port accepts this cargo. A competent handling provider must assess the actual centre of gravity, lifting points, equipment, access and securing requirements before any lift is arranged.

Illustrative cargo data for the port-loading discussion
Cargo fieldTeaching inputRequired confirmation
Units4 skids, S01–S04Exact identity and condition at handover
Outside size each400 × 120 × 150 cmInclude supports and protrusions
Gross weight each2,500 kgUse a reliable measured weight
Total gross weight4 × 2,500 = 10,000 kgDoes not establish a crane selection
Volume4 × 4.00 × 1.20 × 1.50 = 28.80 m³Cargo dimensions remain needed for stowage
Lifting and stackingEngineered arrangement required; no stacking assumedObtain approved lifting points and restraint plan

For a real quotation, attach drawings and photographs of the finished shipping unit. Distinguish a marked lifting point from a feature that merely looks convenient to use. The port team needs the pickup and landing positions as well as the weight. A quoted hourly rate is not confirmation that the proposed crane can safely perform the movement.

Compare the same shipment through the same destination scope

Every USD figure below is invented to explain cost allocation. Assume the goods base value is USD 40,000, the agreed operation is feasible and both alternatives use the same vessel movement. Duties, taxes, cargo insurance, inspections, storage and exceptional work are excluded. These totals are not live quotes or final landed costs.

Illustrative FAS and FOB comparison in USD
Cost lineFAS exampleFOB example
Goods plus seller’s priced origin road, export and alongside work41,30041,300
Loading package in seller’s priceNot included450
Illustrative supplier sale price41,30041,750
Buyer’s separately arranged loading package450Included above
Main ocean carriage2,8002,800
Destination handling and road connection900900
Import clearance service, excluding taxes150150
Destination unloading320320
Comparable listed total45,92045,920

The origin work embedded in USD 41,300 is assumed to be USD 900 road transport + USD 150 export-service coordination + USD 250 port access and alongside handling, on top of the USD 40,000 goods value. The FAS comparison is 41,300 + 450 + 2,800 + 900 + 150 + 320 = USD 45,920. The FOB comparison reaches the same total because the assumed USD 450 loading work is already in the supplier price.

In a real contract the loading package may be arranged differently or included in another service line. Ask which operation each amount buys and whether it is already covered by the freight contract. Commercial margins can also differ. The table demonstrates a method for comparing scope; it does not require FAS and FOB prices to have equal totals.

Check minimum time and overtime on the loading quotation

The teaching USD 450 loading package can be reconstructed from an assumed three-hour minimum at USD 120 per hour plus USD 90 for a separately specified rigging service. These numbers are invented and do not describe a port tariff. Actual equipment selection and work scope must precede the price calculation.

Original loading-cost sensitivity
ScenarioCalculation / USDDifference from base
Completed within the assumed three-hour minimum3 × 120 + 90 = 450Base
Operation uses 4.5 hours, billed by actual half-hour in this example4.5 × 120 + 90 = 630180 more
Operation uses 5 hours5 × 120 + 90 = 690240 more

Ask how the clock begins and ends, whether there is a minimum call-out, how partial hours are rounded and whether standby is a separate charge. If the crane arrives before access is available, an apparently short lift may create a longer bill. Record the cause and approving contact for extra time. Who bears an exception depends on the agreement and circumstances; do not allocate it mechanically from the word loading.

Keep an event record for the handover and lift

Original port handover record
EventEvidence to retainWhy it matters
Port arrivalSkid IDs, vehicle receipt, condition photos and timeIdentifies arrival without assuming delivery is complete
Alongside position confirmedLocation, nominated vessel, count, condition and receiptEvidence relevant to the agreed FAS handover
Lift and landing on boardAccepted lift record and on-board confirmationEvidence relevant to the agreed FOB handover
Loading exceptionDamage, time, responsible contacts and immediate actionPreserves facts without prematurely deciding liability
Vessel or berth changeRevised nomination and accepted operating planShows why the original plan or quote changed

In a normal sequence, goods might arrive at a port yard at 08:00, reach the agreed alongside position at 13:00 and be loaded on board at 17:00. Those are three different events. These times are invented. If an incident occurs at 15:00, the investigation needs its precise location and the handover records, not merely the truck’s 08:00 arrival stamp.

The example assumes proper nomination, notices and identified goods. Vessel delay, failure to provide instructions or other non-performance can affect risk and extra-cost allocation under the complete rules and contract. Escalate those facts to the commercial parties rather than treating the simplified timeline as a ruling on a dispute.

Resolve the vessel, berth and receiving conditions together

Before dispatch, obtain the nominated vessel, agreed loading window, receiving location and contact responsible for changes. Confirm whether the supplier or buyer books the equipment and whether the operator accepts the lifting method. If the intended berth changes, recheck the road approach, ground conditions and position of the cargo relative to the equipment.

At destination, identify how the receiver will collect and unload the four skids. An economical origin arrangement does not remove the need for suitable receiving equipment. Keep destination work in the total comparison, even though it occurs after the origin sales delivery. This makes the financial plan useful for the order rather than only for the port invoice.

Use the agreed named origin port and the Incoterms 2020 edition in the contract, with enough operational detail to identify the actual handover. Confirm payment and ownership terms separately. A rule selection should be reflected in the instructions sent to the supplier, forwarder, port operator and buyer’s receiving team.

Questions buyers often ask about FAS and FOB

Is FAS the same as delivered to a port warehouse? No. Establish the alongside-ship delivery required by the agreed arrangement. A warehouse or terminal receipt may record an earlier event.

Does FOB include the international freight? The buyer arranges the main carriage under the standard allocation. Any additional seller service must be clearly agreed and priced.

Does a lighter load automatically cost less to lift? The quote also depends on equipment, reach, access, work time and the actual operation. Give the handling provider the complete cargo and site information rather than estimating from total tonnes alone.

Discuss your port handover and freight scope

Send the cargo drawing or photographs, packed measurements, loading requirements and named port. Our team can assess the services to coordinate and the information needed before a firm booking.

  1. A unit-by-unit cargo record, drawings, verified weight and approved lifting information.
  2. The named origin port, nominated vessel, precise handover position and loading-window contacts.
  3. The itemised loading quote with minimum time, rounding, standby rules and destination handling scope.

Your checklist will be included in an editable quote request. Add your route and goods, then send it to our team by WhatsApp or email.

Example costs and timelines are for planning. Send us your cargo, route and delivery needs for a shipment-specific quote and acceptance review.