VelFreight arranges China supplier pickup and onward freight under an agreed collection scope. Whether your purchase is EXW or FCA, define who loads and handles export formalities before comparing the full transport cost.

Ask VelFreight about this shipment ↗
OUR RECOMMENDATION

Match the rule to loading and export arrangements

Send the supplier’s sale term and exact pickup point with the finished cargo details. We review the collection, loading handover, export coordination and onward freight you need, and separate work already included in the supplier price.

Compare your options ↓

Choose the option that fits

  1. You want the supplier to load your collecting vehicle

    Review FCA at the supplier’s precise loading point, with the buyer’s carrier appointment and vehicle requirements confirmed.

    Before choosing: A factory address does not establish the vehicle access, loading equipment or collecting carrier acceptance.

  2. The supplier proposes EXW and you appoint the forwarder

    Confirm how loading, export declarations and any required authorisations will actually be arranged before approving collection.

    Before choosing: A forwarder’s quotation cannot by itself make an overseas buyer eligible to perform a local customs role.

  3. You want the supplier to deliver to a consolidation warehouse

    Compare FCA at that named warehouse with FCA factory, showing the additional road leg and the exact receiving point.

    Before choosing: Receiving charges, unloading and additional packing must be visible in the quote; a city name is insufficient.

EXW and FCA change the handover, not the physical cargo

EXW means Ex Works. FCA means Free Carrier. Under the usual EXW arrangement, the seller makes the goods available at the agreed place without loading the collecting vehicle or completing export clearance. Under FCA, the seller handles export clearance. At the seller’s premises FCA delivery includes loading the buyer-arranged vehicle; at another named place the goods arrive on the seller’s vehicle ready for unloading. Both rules can be used with any transport mode. Record the loading and export responsibilities before comparing supplier prices.

Start with the job that must happen at the gate. For six heavy pallets, someone must provide a suitable truck, a compatible forklift, a safe loading area and the people to perform the lift. Assign an owner to each job. Then align the sale wording with that plan, rather than expecting three letters to arrange the equipment.

Use one measured shipment for all three offers

The following original teaching shipment contains ordinary boxed metal fittings, without batteries or liquids. It is fictional and is not a customer shipment. Each pallet’s dimensions include its base, wrapping and protection. The consignment is ready together at a supplier in Ningbo; its exact factory and receiving addresses would be required for a real quotation.

Illustrative cargo record: six identical pallets
InputValueCheck before quotation
Pallet count6Keep pallet IDs P01–P06 on the packing list
Outer dimensions each120 × 100 × 120 cmMeasure finished units, including overhang
Gross weight each300 kgInclude pallet and packaging
Volume6 × 1.20 × 1.00 × 1.20 = 8.64 m³Do not use bare-product dimensions
Total gross weight6 × 300 = 1,800 kgConfirm individual as well as total weight
HandlingNon-stackable in this exampleAsk the selected provider how this affects space charges

The 8.64 m³ figure describes packed volume. It does not establish container fit or the charge for non-stackable freight. Keep the product list, dimensions, weights and packing revision identical when requesting EXW and FCA options. Otherwise a price difference may reflect different cargo assumptions.

Compare the complete origin package in one currency

All amounts below are invented USD inputs for calculation, not freight rates, supplier prices or a service offer. The destination for this comparison is the same consolidation warehouse. The goods themselves cost USD 10,000 before the listed origin work. Assume each job is charged once and the relevant parties have confirmed that they can perform it.

Teaching example: same goods and same warehouse endpoint
Cost line / USDEXW factoryFCA factoryFCA receiving warehouse
Goods plus seller’s listed work10,00010,18010,440
Buyer-paid loading60Included aboveIncluded above
Buyer-paid export coordination / declaration service120Included aboveIncluded above
Buyer-paid factory-to-warehouse road leg260260Included above
Buyer-paid warehouse receiving / unloading909090
Comparable listed total10,53010,53010,530

EXW total = 10,000 + 60 + 120 + 260 + 90 = USD 10,530. The FCA factory price includes the assumed USD 180 loading and export-service package, so adding it again would double-count those services. The FCA warehouse price also includes the assumed USD 260 road leg. This example holds the combined cost constant to show allocation; actual supplier margins, rates and capabilities can produce different totals.

These totals exclude international carriage, insurance, destination charges, duties, taxes, storage and exceptional work. They are not a landed-cost calculation. If an offer combines several jobs into one line, ask which specific jobs are included before comparing it with another offer.

Check whether an FCA premium buys a lower complete cost

Suppose the FCA factory goods-and-service price becomes USD 10,250 while the EXW inputs remain unchanged. The FCA comparison becomes 10,250 + 260 + 90 = USD 10,600, or USD 70 above the EXW total. That is the visible price difference for the stated scope. It does not decide whether the EXW operating arrangement is feasible.

If arranging EXW export work then requires an additional confirmed USD 100 service, the EXW total becomes USD 10,630. Under those revised assumptions FCA is USD 30 lower. Retain both revisions and the reason for the change. A supplier’s higher headline price can cover work that the buyer would otherwise purchase separately; an unpriced obligation should remain an open item rather than being entered as zero.

Record the actual transfer with package-level evidence

Original handover record for the six-pallet example
StageRecord to retainQuestion to close
Before collectionPacking list revision; P01–P06 photos; readiness confirmationAre all six pallets complete and accepted?
Vehicle arrivalDriver / carrier identity; registration; appointmentIs this the nominated vehicle and can it be loaded?
Loading or receivingTime, location, package count and condition exceptionsWhat event satisfies the agreed handover?
Export documentsNamed responsible party, document list and approval trailWho checks and supplies the required information?
After departureReceipt or collection record; discrepancy noticeDid the measured cargo or accepted scope change?

Do not use a freight invoice as the only proof of delivery. An invoice records charges, while the collection record can identify where the pallets were, who received them and whether damage was noted. Keep photographs linked to the pallet numbers rather than an unlabelled collection of images. If the carrier records one pallet short, reconcile the count immediately before documents and transport milestones drift apart.

Make the named place and export arrangement usable

Write the selected rule, agreed location and edition together, for example: “FCA loading bay 2, supplier’s full address and postcode, Ningbo, China, Incoterms® 2020”. This is a format example; replace it with the actual agreed location. A different warehouse requires different wording and a fresh scope check.

For an EXW enquiry, identify the party legally able to undertake the export role, the documents it needs and the supplier’s agreed cooperation. Do not assume the party paying a broker becomes the exporter. For FCA, the supplier’s export responsibility still needs accurate product information and timely coordination. Customs arrangements depend on the transaction and applicable local rules.

Incoterms do not settle ownership transfer or payment dates. Record those separately in the sale contract. If the supplier changes the named place, loading arrangements or packing after quotation, update the sale wording and transport instructions together. The operational comparison should then use the revised pickup point and measured shipment.

Keep each supplier’s sale term visible in a consolidated pickup

Suppose the earlier six-pallet shipment instead comes from three fictional suppliers, each providing two identical pallets. Each supplier contributes 2 × 1.20 × 1.00 × 1.20 = 2.88 m³ and 600 kg; the combined cargo remains 8.64 m³ and 1,800 kg. A shared truck does not merge three sale contracts into one. Record the rule and named point for each supplier, then map each pallet to its order and collection receipt.

Supplier A might sell EXW its factory, Supplier B FCA its factory and Supplier C FCA a named warehouse. Their loading, road transport and export arrangements require separate checks. The EXW or FCA responsibilities still apply to each transaction. Do not assume that consolidating the transport allows one declaration or makes the truck operator the exporter. The responsible customs parties must confirm the actual declarations, supporting records and permitted arrangement.

Illustrative three-supplier collection control
Order / palletsCargo contributionRecord separately
A / P01–P022.88 m³ / 600 kgEXW collection point; loading owner and export arrangement
B / P03–P042.88 m³ / 600 kgFCA factory loading and seller’s export coordination
C / P05–P062.88 m³ / 600 kgFCA warehouse handover; avoid buying its included road leg twice

The route comparison below is a separate arithmetic exercise in which all six pallets require the same collection work under the two offers. If Supplier C already includes delivery to that warehouse, remove that duplicated road service before using the figures. Keep exporter and documentary costs outside the route comparison until their actual scope is established.

Calculate whether a shared collection route actually saves money

All USD figures here are invented. Compare three dedicated collections priced at USD 180, 240 and 150 with an accepted shared route priced at USD 350. Both alternatives include the same assumed USD 90 receiving service. The shared option adds a separately specified USD 180 cross-dock and sequencing service; it must be distinct from the common receiving work.

Teaching road-and-receiving comparison only, USD
WorkDedicated collectionsShared route
Road collection180 + 240 + 150 = 570350
Common receiving scope9090
Additional cross-dock / sequencing0180
Comparable subtotal660620
If shared routing adds USD 50 waiting660670

The base saving is 660 − 620 = USD 40. Shared-route extra costs above USD 40 erase that advantage; an added USD 50 waiting charge makes it USD 10 more expensive. This is not a tariff or an assurance that a vehicle can perform the route. Confirm loading windows, vehicle capacity and cargo compatibility before using the cheaper subtotal. International freight, export services, insurance and destination costs remain outside both totals.

Questions to answer before the pickup is booked

Does EXW include loading? The basic EXW allocation does not require the seller to load the collecting vehicle. If the seller will load in practice, put the arrangement and its consequences into the agreement instead of leaving it as an informal favour.

Does FCA include the international freight? FCA identifies an origin handover. Establish the buyer-arranged onward carriage and its charges separately; a supplier’s additional transport service needs an explicit scope.

Can the same product have different EXW and FCA prices? Yes. Compare the complete packages with the same currency, date, goods and endpoint. The teaching table is an allocation exercise, not a rule requiring equal prices.

Quote collection from your Chinese supplier

Share each supplier’s address, sale term, ready date and package list. We can review a single pickup or a combined collection plan and identify the loading and document arrangements to confirm.

  1. The supplier’s full address, proposed rule, edition and exact handover point.
  2. A finished package list with pallet IDs, dimensions, weights, photographs and stacking limits.
  3. The loading contact, export-role arrangements and itemised quote showing included and excluded origin work.

Your checklist will be included in an editable quote request. Add your route and goods, then send it to our team by WhatsApp or email.

Example costs and timelines are for planning. Send us your cargo, route and delivery needs for a shipment-specific quote and acceptance review.