A shipment should leave the supplier only after the buyer’s release conditions are met. VelFreight coordinates collection and freight around your inspection, correction and approval milestones, helping keep rejected or unfinished goods out of the booked dispatch.
Agree the checks and release decision before the inspector arrives
Agree the inspection scope and release authority with your supplier and appointed inspector, then share the planned dates with us. We align warehouse receiving and freight preparation with the released quantity and update the transport plan if corrections change readiness.
Compare your options ↓Choose the option that fits
What does a pre-shipment inspection in China actually check?
A pre-shipment product inspection checks an identified production lot against the buyer’s agreed requirements before dispatch. Its value depends on the scope, access, selection method and recorded results. Specify who can approve shipment after reviewing the report; do not assume the inspector, factory and freight forwarder all hold that authority.
Use a written instruction that links the purchase order, approved product version, measurable criteria and packing requirements. Define which checks are visual, functional or dimensional, and which need separate laboratory work. If a characteristic cannot be checked on site, record it as outside scope or awaiting evidence. A report should not silently convert “not tested” into “passed”.
| Check | Main question | Limit to keep visible |
|---|---|---|
| Warehouse receiving count | Did the stated cartons or pallets arrive? | An outer count does not establish the quality of every product |
| Pre-shipment product inspection | Does the inspected lot meet the agreed checked requirements? | Sampling is limited; the report has a defined scope |
| Laboratory testing or certification work | Does the product satisfy specified test or certification requirements? | Required methods, scope and applicable rules need separate review |
| Customs examination | Are the authority’s import/export requirements satisfied? | Customs release is a different decision from buyer quality approval |
| Carrier acceptance | Can the proposed service carry the declared packed goods? | Cargo acceptance does not approve product quality |
These records can support one another without becoming interchangeable. Keep a product-release decision separate from the logistics instruction. The sample-shipping guide covers sending and identifying an approval sample; the task here is checking the production lot that will actually ship.
Build the 2,000-unit lot record and confirm readiness
Consider one invented order of non-electrical desktop holders: 2,000 units packed in 100 cartons, with 20 units per carton. All quantities, observations, prices and day numbers in this case are teaching inputs, not customer results or inspection-company quotations. The buyer has approved specification V3 and an identified physical reference sample. Product suitability and any regulatory requirements remain separate from the limited checks illustrated here.
| Field | Case instruction | Control before attendance |
|---|---|---|
| Order quantity | 100 cartons × 20 units = 2,000 units | Reconcile the physical quantity with the purchase order |
| Production sub-batches | A: 40 cartons / 800 units; B: 35 / 700; C: 25 / 500 | Retain batch and carton identification through inspection |
| Product version | Specification V3 and reference sample RS-03 | Withdraw superseded specifications from the inspection file |
| Measured feature | One specified length: 250 ± 2 mm | Use the agreed method; allowable interval is 248–252 mm |
| Visible finish | Approved photo criteria for the identified surface | Define the lighting, viewing method and defect classification |
| Product label | Approved model and artwork revision | Compare the actual label with the agreed reference |
| Case readiness | All 2,000 units produced; all 100 cartons accessible and packed | Provide safe access and permission to open and repack selected cartons |
Confirm how much of the order must be produced and packed for the agreed inspection, which cartons must be accessible, and whether the inspector may open and reseal them. Share the inspection and buyer-release dates with us so collection follows the approved quantity and readiness.
For this case, 80% of 100 cartons would be 80 cartons, but the buyer requests access to all 100. The supplier must disclose unfinished or inaccessible stock rather than presenting a convenient subset as the whole order. Agree responsibility for opening, moving and resealing cartons, and identify any destructive tests before selecting units.
Specify the sampling method without inventing an AQL rule
ISO 2859-1:2026 is the third edition of the AQL-indexed attribute-sampling standard used for this discussion. If a contract uses an AQL scheme, agree the applicable edition, lot definition, inspection level, defect classifications and acceptance/rejection rules with the inspection specialist. Record the actual sampling plan and its instructions before the inspector starts.
For illustration only, this buyer commissions a diagnostic screen of 100 units drawn from 20 cartons: eight cartons from batch A, seven from B and five from C, with five units checked from each selected carton. The inspector selects the cartons and units within the agreed groups, rather than accepting factory-picked show samples. The counts are 40 + 35 + 25 = 100 units, or 5% of the order. This is a buyer-defined example, not an ISO sample-size recommendation, statistical confidence claim or AQL acceptance table.
The case instruction is to hold shipment for buyer review if a specified discrepancy is recorded. There is no invented “acceptable number of defects” hidden in that rule. Acceptance sampling primarily supports the decision about a lot; its main purpose is not to estimate the lot’s quality. In particular, do not multiply a sample’s observed defect percentage by 2,000 and call the result the actual defective quantity.
Keep the selection record, measured results and photographs tied to individual sample IDs. Record which checks were performed on every selected unit and which had a smaller agreed test group. If a test damages a unit, identify its disposition and replacement quantity; the fictional observations below are non-destructive.
Count defect observations and affected units separately
Suppose the 100-unit screen produces the following findings. The sample IDs are temporary inspection references linked to the lot record. The dimensional result is outside the buyer’s stated 248–252 mm interval. The finish and label findings are judged against the fictional approved criteria, not a universal defect classification.
| Finding | Affected sample IDs | Observation count | Recorded requirement |
|---|---|---|---|
| Visible finish discrepancy | U014, U027, U058 | 3 | Outside the agreed finish-photo criteria |
| Incorrect model label | U027, U083 | 2 | Label does not match the approved model reference |
| Length outside tolerance | U091 | 1 | Measured 253 mm; agreed maximum 252 mm |
| Total observations | U027 appears in two finding rows | 6 | Do not treat this as six different products |
| Distinct nonconforming units | U014, U027, U058, U083, U091 | 5 | Five of the 100 checked units have at least one recorded issue |
Six observations per 100 checked units is a different measure from five distinct nonconforming units per 100 checked units. Neither proves that the remaining 1,900 units have the same pattern. “No issue observed” also says nothing about a characteristic outside the agreed inspection scope. Preserve the original report and require a separate dated response to each finding.
In this example, the buyer requests a full sort for the specified issues because correcting the five sample units alone would not resolve the unexamined stock. The sort must use the same criteria and retain the batch relationships. A supplier statement that “everything was fixed” is insufficient to reconcile quantities or identify what changed.
Reconcile the whole lot after the correction decision
Assume the subsequent full sort records 80 distinct units requiring approved correction, including the five initially identified. That is a new fictional observation from the full sort, not an extrapolation from the sample. The correction method is approved for those issues, and follow-up verification records that all 80 corrected units meet the specified checks. If a real correction cannot restore conformity, the buyer must decide on replacement, exclusion or another permitted disposition.
| Stage | Units meeting the specified checks | Units still held | Total physically accounted for |
|---|---|---|---|
| After full sort, before correction | 1,920 | 80 | 2,000 |
| After work is performed but before verification | 1,920 | 80 awaiting verification | 2,000 |
| After verification and buyer disposition | 1,920 + 80 = 2,000 | 0 | 2,000 |
| Final packing reconciliation | 100 cartons × 20 approved units | 0 | 2,000 |
Performing rework and approving the result are different events. The second row keeps corrected units on hold until the required evidence exists. If sorting changes carton contents, update the carton-to-batch mapping and packing list. The shipment quantity can remain 2,000 while its packing-record version changes. Use the packing-list guide for that handover.
Calculate inspection, correction and logistics consequences together
The CNY example below assumes the buyer funds all listed work initially; it does not decide who ultimately bears the cost under the purchase contract. Every rate is invented. Inspection allowances include the assumed report and travel scope. The initial visit is a committed cost once performed, so retain it when comparing the total order outcome, but do not count it again as an incremental choice.
| Cost line | Quantity × assumed rate | Amount |
|---|---|---|
| Initial inspection and report | One agreed visit | 900 |
| Full sort for specified issues | 2,000 units × 0.40 | 800 |
| Approved correction work | 80 units × 3.00 | 240 |
| Repacking materials and work | 100 cartons × 1.20 | 120 |
| Follow-up inspection and report | One agreed visit | 750 |
| Additional origin storage | 4 chargeable days × 80.00 | 320 |
| Freight rebooking administration | One assumed charge | 200 |
| Total listed cost | 900 + 800 + 240 + 120 + 750 + 320 + 200 | 3,330 |
| Extra cost after the initial visit | 3,330 − 900 | 2,430 |
| Allocation per ordered unit | 3,330 ÷ 2,000 | 1.665 |
The 80 units found by the full sort are 4% of this fictional lot. That number is supported by the assumed full-sort record, unlike projecting 5% from the earlier sample. Keep correction charges on 80 units and sorting charges on all 2,000: applying the correction rate to the entire order would price a different job.
The subtotal excludes the goods, normal freight, duties, taxes, insurance, laboratory testing and unlisted exceptions. The storage and rebooking lines belong to the timing scenario below. A split release would need its own verified quantities, two transport scopes and additional documentation; it cannot be priced by taking 96% of the original freight quote. Obtain approval and evidence before describing stock as conforming and available.
Place verification and buyer approval before the pickup clock
The following invented schedule uses consecutive operating days, all in China Standard Time, with the stated staff and transport availability. It is not a promised inspection duration. The provider’s original origin-receiving cutoff is Day 5 at 12:00; collection and transport to that receiving point require eight elapsed hours after release.
| Event | Case time | Dependency or result |
|---|---|---|
| Initial inspection and report | Day 1; report at 18:00 | Buyer receives the recorded findings |
| Buyer authorises full sort | Day 2 at 09:00 | Factory begins the approved work |
| Full sort completed | Day 3 at 17:00 | 80 distinct units identified for correction |
| Correction and repacking completed | Day 4 at 13:00 | Goods ready for follow-up checking |
| Follow-up report issued | Day 4 at 18:00 | Buyer reviews verification evidence |
| Buyer releases the shipment | Day 5 at 09:00 | Collection can begin |
| Eight-hour collection and transport | Day 5, 09:00–17:00 | Arrival misses the 12:00 cutoff by five hours |
| Next assumed receiving cycle | Day 9 at 12:00 | Receiving point accepts early holding under agreed terms |
For the example, the origin receiving point accepts arrival on Day 5 at 17:00 and bills four holding days, Day 5 through Day 8, before dispatch on Day 9. The assumed contract excludes the dispatch day. This produces the CNY 320 storage line above. Actual operators may count days differently; confirm the tariff and acceptance before sending the truck.
The release would have needed to occur by Day 5 at 04:00 to leave eight hours before noon. A Day 5 at 09:00 approval cannot meet that plan. Request a changed receiving arrangement or booking after reviewing the evidence; do not solve the five-hour gap by deleting verification. The ocean-cutoff guide explains why warehouse receiving, terminal, shipping-instruction and VGM deadlines must remain distinct.
Choose a provider using the scope and evidence they can deliver
Ask the prospective provider to describe its experience with the product, inspector competence, independence, site access and reporting format. Request a sample report showing measurements, photos and unperformed checks. Confirm which work is on site, subcontracted or sent to a laboratory, and how the buyer receives exceptions before the planned pickup. A recognisable company name does not define the purchased scope.
Obtain a written quotation covering inspection duration, travel, sampling, tests, opening and repacking, report delivery, cancellation, failed attendance and reinspection. Confirm that the factory can provide access and the agreed equipment. Link the buyer’s decision to a named lot and report revision, then tell the freight coordinator precisely which quantities and cartons are released.
We coordinate collection and receiving against the quantity and release date approved by your buyer and appointed inspector. Assign product inspection, testing and quality approval to the responsible parties, then send us the release result so we can update the transport plan. For goods waiting at origin, see the warehouse-cost guide.
Common pre-shipment inspection questions
Does pre-shipment inspection check every product?
Only if the agreed scope requires that. The example starts with 100 units and later commissions a full sort of 2,000 for specified issues. An outer-carton count, a sample inspection and a full sort are different jobs.
Does AQL 2.5 mean that 2.5% of this shipment may be defective?
Do not use an AQL value as a simple permission to ship that percentage of known defective products. Apply the agreed sampling scheme and disposition rules.
Why are there six defects but only five affected units?
Sample U027 has both a finish and a label issue. The finding log therefore contains six observations across five distinct units. Preserve both counts rather than adding every finding as another defective product.
Can a factory ship immediately after saying it has reworked the goods?
Follow the agreed release process. In the example, 80 corrected units stay held until verification and buyer disposition. The final packing list and transport instruction must match the quantities actually released.
How much does a China pre-shipment inspection cost?
Request a product- and location-specific inspection scope covering attendance, tests, reporting and repeat visits. The CNY 900 first visit and CNY 3,330 combined example are invented inputs. Send us the inspection and release dates so the freight plan can follow your approved quantity and readiness.